ChinaConstruction crane in China at the Three Gorges Dam.
Germany Corrosion problems because of high humidity and salt contents in air.
AustraliaHolding and emergency brakes on the main hoisting winch.
United KingdomApplication - 80 Tonne Semi Portal Slab Handling Crane, Dogging hoist. replace an electromagnetic brake on the Dogging Hoist.
GermanyHigh-quality tower and harbour cranes. Extremely compact design of the brakes has made it possible to generate a braking torque of 1850 Nm
DenmarkSuper Post Panamax Container Cranes for port. Braking systems for Main and Boom Hoist.
DenmarkCrane with the ability to turn ship in mid air. Installation: Emergency and service brakes, floating rail clamps and hydraulic brake systems.
AustraliaThruster operated brakes on Harbour RTG’s. Motion - Main hoist for container lift.
FinlandShip Gantry Cranes. Brakes with automatic wear adjustment, AWA as they had to work as service brakes, with 600 operations/hour.
FinlandBraking systems on 10 rubber tire gantry cranes for port Brake advantages: Compact design, large clamping force, large brake pad area, reduced loss of spring force, easy maintenance and high safety.
DenmarkSTS crane - Panamax type with outreach of 38m and lifting height 29.5m. Lifting capacity 43 tons under the container spreader and 70 tons in hook.
IndiaCranes designed with electro magnetic brakes, but after only a few years on hot metal the cranes mal-functioned.
GermanyWorked for years under extreme difficult conditions without anyproblems.
South AfricaEmergency brake system installed on ladle crane.
LuxemborgBrakes installed on a steel work crane.
Czech RepublicTwo 330 t Black Smith Hammer steelwork cranes with 250 kW drives. The brakes are in action each second during 2 hours, totally 6 hours a day.
Slovakia250 t steelwork crane with 4 discs on 2 drums installed.
SpainLuffing crane used in construction in tight areas. Boom hoist equipped with parking and emergency brake.